OBJECTIVE
To provide standard instructions for the operation of the Malvern Zetasizer (Nano-ZS-ZEN3600)

SCOPE
The operation of the particle size analyzer is to measure particle size, molecular weight, and zeta potential.


RESPONSIBILITY
  • QC analysts and related personnel are responsible for the implication of this procedure.
  • QA head is responsible for regular and required amendments in the Standard Operating Procedure.


PRECAUTIONS
  • Make sure to switch off the instrument when not in use.
  • Cells should be cleaned prior to use. All sizes and Zeta potential cells should be rinsed/ cleaned with filtered dispersant before use.
  • The cell should be filled slowly to avoid air bubbles. Ultrasonication can be used to remove air bubbles, but only if the sample is suitable for use with ultrasonics.
  • When using a syringe for the dispersant, never use the first few drops from the syringe to avoid contamination of the dispersant by residual dust particles.
  • Hold the cuvette from the top to prevent tampering with the measurements, and wipe the sides with clean tissue.

PROCEDURE
  • Turn ON the instrument and wait for 1 hour for the laser to stabilize.
  • Start the Zetasizer software.
  • Choose the appropriate one for the measurement. Organic solutions can only be measured in a glass cuvette.
  • Fill the cuvette to a depth of approximately 1 cm.
  • Make a new measurement file, then select Measure → Manual.
  • Click on the measurement type to choose the experiment type.
  • Click on the sample and choose the name, and write any notes as needed.
  • Click on Sample Material and choose your sample material from the list.
  • You may add a new material if the refractive index is known.
  • Choose a dispersant or add a new one as needed.
  • Temperature: at least 120s equilibrium time should be allowed since the room is very cold.
  • Cell type: choose a category and model.
  • Measurement: duration and repetitions may be adjusted.
  • Press OK to accept the measurement settings.
  • Load the sample and press Start.
  • To view the data, select a measurement and look through the tabs (e.g., intensity or volume PSD).
  • On a particular tab, select Edit → Copy Size Values/Graph.
  • Then the data can be transferred to an Excel spreadsheet.
  • Turn off the instrument.

CLEANING AND MAINTENANCE
  • Switch OFF the instrument.
  • Switch OFF the mains for the power supply.
  • Clean the instrument with a soft de-dusting cloth.
  • Care must be taken that samples are not split on the instrument or in the cuvette chamber.

ABBREVIATIONS
QC: Quality Control
QA: Quality Assurance
SOP: Standard Operating Procedure
IPA: Isopropyl Alcohol

ANNEXURE
Nil

REVISION HISTORY
Nil